Community Energy Case Study: Summerside, P.E.I.
Download the full document (pdf document)
CanmetENERGY
CETC Number 2009-09-14-Summerside / 2009-09-14
The City of Summerside proposes to construct and operate a four turbine, 12.5 MW wind farm that would produce 38.33 GWh of electricity annually to the City.